This article applies to lender or forwarders using Switch
Step 1: Hover on Requestor's Menu
Step 2: Click on Mappings
Step 3: Click on Create New Mapping
Step 4: Select Priority
*Note: The catch all is designed to be the end of the priority list for designating a case to a vendor based on the rules in place. if a case does NOT meet any mapped rules it falls to the catch all rule. a schedule needs to be mapped to the catch all rule.
Priority is a waterfall down formula, with 1 being the highest priority, and then 2, 3, 4 and so on
Step 5: Select your desired Rule
Step 6: Select the desired schedule to be mapped with the rule
Step 7: Select the desired LPR schedule to be mapped with rule and RCS schedule (if applicable)
Step 8: Click Save